Objectives of Project:
– Reconstruct and rehabilitate three hill lakes.
– Irrigate all Mrusti lands by drip irrigation and through conveyance systems that are automatically controlled by humidity sensors.
Results of Project:
– Design of irrigation schemes to cover whole village, and to enable its operation on in ground humidity sensors Installation of two new main primary irrigation networks
– Installation of irrigation secondary line and tertiary drip irrigation lines Restoration of three hill lakes.